Wind Turbine CAPA Programme
50%Failure rate cut
15%Energy output affected
50%Failure rate cut
1 quarterResult period
Engagement summary
What was recorded.
A wind farm was losing 15% of energy output to repeat component failures. The trail led to one supplier — inconsistent materials, missing certifications. New supplier, tighter vetting, scheduled audits. Failure rate halved within the quarter.
Recorded detail
At a glance.
Starting point
- A wind farm was losing 15% of energy output to repeat component failures.
- The trail led to one supplier.
Findings
- Inconsistent materials.
- Missing certifications.
Response and result
- New supplier.
- Tighter vetting.
- Scheduled audits.
- Failure rate halved within the quarter.