Wind Turbine CAPA Programme

50%Failure rate cut
15%Energy output affected
50%Failure rate cut
1 quarterResult period
Engagement summary

What was recorded.

A wind farm was losing 15% of energy output to repeat component failures. The trail led to one supplier — inconsistent materials, missing certifications. New supplier, tighter vetting, scheduled audits. Failure rate halved within the quarter.

Recorded detail

At a glance.

Starting point

  • A wind farm was losing 15% of energy output to repeat component failures.
  • The trail led to one supplier.

Findings

  • Inconsistent materials.
  • Missing certifications.

Response and result

  • New supplier.
  • Tighter vetting.
  • Scheduled audits.
  • Failure rate halved within the quarter.